Overview
REF Window 5
In a move to increase Solar Home System (SHS) installations and electrification of households in rural areas of Rwanda, the Renewable Energy Fund (REF) and Rwanda Energy Access and Quality Improvement Project (EAQIP) off-grid component 3a implemented by the Development Bank of Rwanda Plc. have launched a Results-based Financing (RBF) subsidy called “RBF Window 5”.
The Subsidy is designed to address the affordability of SHS faced by rural households through the reduction of prices for the systems at varying amounts allocated to Ubudehe 1, 2, and 3 categories with the aim of reaching the lowest income population in Rwanda.
The FRW 29.24 billion (US$ 30 million) subsidy window is funded by the World Bank and is expected to trigger at least 370,000 off-grid connections. It is expected that this RBF facility will boost uptake of REF funds thus enabling the project to connect Rwandan households using off-grid solutions. The subsidy will be channeled through eligible Off-grid Solar Companies (OSCs) that have signed a Memorandum of Understanding with EDCL and the supplied SHSs must be meeting the Ministerial Guidelines on Minimum Standards Requirements for Solar Home Systems that was published in June 2019.
Click the links below for: |
Related Projects
110 kV Nyabarongo 1 HPP-Kilinda
This is a line of 28 km linking Nyabarongo Hydropwer to Kilinda Substation. It was completed in 2014.
View projectIncreasing Access to Electricity to Some Areas in Rwanda
Grid extention by 194 km of Medium Voltage lines and 489 km of Low Voltage lines and 133 distribution transformers
View project110 kV Ntendezi–Bugarama
This project included the construction of a 17.5 km transmission line linking Ntendezi and Bugarama with the associated substations. This line transmission line will ensure power stability in the West of Rwanda and CIMERWA factory
View projectEASSDP- Electricity Access Scale up and sector wide Approach development project. CR N° 4651-RW
EASSDP- Electricity Access Scale up and sector wide Approach development project. CR N° 4651-RW information published by Rwanda Energy Group.
View projectRusumo Falls Hydro Power Project
The project is being developed under NELSAP umbrella for Rwanda, Burundi and Tanzania funded by the World Bank. Rusumo falls Hydropower Project is planned to generate 80 MW and the power output will be shared equally by three countries. The project consists of concrete dam with crest length of 150m,Headrace Tunnel of 460m and a surface power station with…
View projectElectricity Access ScaIe-Up Project Loan Agreement N°1293P”
Electricity Access ScaIe-Up Project Loan Agreement N°1293P” information published by Rwanda Energy Group.
View project