Overview
Hydro Power in Rwanda
Over the last decade, Rwanda’s hydropower sector showed a tremendous progress. Overall installed capacity of power is about 390.04MW, hydropower contributing 39.6% of it.
This was achieved by involving private investors in the energy sector; Independent Power Producers (IPPs). Equally contributed to achievement in energy sector is a conducive legal and regulatory environment for private investors in this area.
Grid connected hydropower plants
37 hydropower plants are grid connected and account to 109.7MW. They include national and shared regional power plant. Hydropower makes up approx. 39.6% of the total installed capacity.
Hydropower plants are publicly owned and operated, leased to private companies, or privately owned (IPP). The publicly owned power plants are managed by the national utility REG/EUCL. They include larger plants such as Ntaruka, Mukungwa and Nyabarongo I.
Off-grid micro hydropower plants
Currently, 11 micro hydropower plants MW exist in Rwanda as isolated networks. These plants were originally developed by the GoR, and handed over to private sector management to increase the private sector contribution in energy generation. GoR has recently leased out these sites to private investor to better operate, upgrade and connect them to the grid. There is also pico hydropower plants in the range of 1-10 kW which are either publicly owned and operated by the local communities or entirely private.
Project List
Related Projects
110kV Jabana-Mt. Kigali-Gahanga and associated substations
The project consists of building a 27km long 110KV transmission line linking Jabana, Mont Kigali up to Gahanga Substation.
View projectRuzizi III
Rusizi III Hydropower (145MW) construction project is supported by the World Bank, EU, AfDB among others with an expected investment capital of $450 million and is expected to be completed by 2024. The project is being developed under CEPGL umbrella for Rwanda, Burundi and DRC. Rusizi III hydropower project planned to generate 147MW and the power output w…
View projectKigali Network Strenghening 2
Rehabilitation of MV underground cable within Kigali city Centre, construction of a 1.5km four circuit overhead line between Gikondo and KBC; replacement of MV underground cables from KBC to Christus. This Project is divided in 3 lots:
View project110 kV Gasogi-KSEZ
The project consists of building a 2.2km long 110KV transmission line linking Gasogi substation to Kigali Special Economic Zone
View projectShema Power Lake Kivu
Shema Power Lake Kivu Limited (SPLK ltd) signed a 25-year power purchase agreement (PPA) with the Rwanda Energy Group (REG) for a 56 MW net power output from methane gas. The Power plant will be located on Nyamyumba sector in Rubavu District. The first barge will provide 14 MW of electricity 15 months after the project reaches Financial Close.
View projectKigali Network Strenghening 1 - 1
Improved stability of power supply in Bugesera and parts of Kigali by replacing a10MVA transformer by a 20MVA at Mont Kigali substation
View project