What We Do

Solar

With a potential of 4.5 kWh per m2 per day and approximately 5 peak sun hours, solar energy has a huge potentiality in Rwanda. Currently, Rwanda’s total on-grid installed solar energy is 12.050 MW originating from 3 solar power plants namely Jali power plant generating 0.25MW, Rwamagana Gigawatt generating 8.5 MW, and the Nasho Solar plant generating 3.3 MW.

At a Glance

4.5 kWh/m²/day

Average solar resource

Reporting period not stated

Overview

Solar

With a potential of 4.5 kWh per m2 per day and approximately 5 peak sun hours, solar energy has a huge potentiality in Rwanda. Currently, Rwanda’s total on-grid installed solar energy is 12.050 MW originating from 3 solar power plants namely Jali power plant generating 0.25MW, Rwamagana Gigawatt generating 8.5 MW, and the Nasho Solar plant generating 3.3 MW. 

The Government of Rwanda intends to increase the number of solar power plants to reduce the cost of production and take advantage of available renewable sources in Rwanda.
 

Project List

Related Projects

Transmission

110 kV Ntendezi–Bugarama

This project included the construction of a 17.5 km transmission line linking Ntendezi and Bugarama with the associated substations. This line transmission line will ensure power stability in the West of Rwanda and CIMERWA factory

View project

Generation , Hydropower

Rusumo Falls Hydro Power Project

The project is being developed under NELSAP umbrella for Rwanda, Burundi and Tanzania funded by the World Bank. Rusumo falls Hydropower Project is planned to generate 80 MW and the power output will be shared equally by three countries. The project consists of concrete dam with crest length of 150m,Headrace Tunnel of 460m and a surface power station with…

View project

Generation , Hydropower

Ruzizi III

Rusizi III Hydropower (145MW) construction project is supported by the World Bank, EU, AfDB among others with an expected investment capital of $450 million and is expected to be completed by 2024. The project is being developed under CEPGL umbrella for Rwanda, Burundi and DRC. Rusizi III hydropower project planned to generate 147MW and the power output w…

View project