Overview
Solar
With a potential of 4.5 kWh per m2 per day and approximately 5 peak sun hours, solar energy has a huge potentiality in Rwanda. The country has already engaged private sector participation into solar solutions as a lighting substitute for remote areas. Currently, over 258,414 households have benefited access to electricity with the solar energy through Independent Power Producers country wide. Households located far away from the planned national grid coverage are encouraged to use Mini-grid Solar Photovoltaics (PVs) to reduce the cost of access to electricity. The Rural Electrification Strategy approved by the cabinet in June 2016 outlines strategies through which Rwanda’s households could “have access to electricity through the most cost-effective means by developing programmes that will facilitate both the end users to access less costly technologies and increase private sector participation in the provision of these solutions” (MININFRA, RES, 2016).
Currently, two mini-grid solar power plant are operational in Kirehe and Nyamasheke Districts.
![]() | NESELTECK Located in Kirehe District with a capacity to generate 30KW |
![]() | RENERG located in Nyamasheke District with a capacity to generate 30KW |
Hydro
Over the last decade, Rwanda’s hydropower sector showed a tremendous progress. Overall installed capacity of power is about 221.1MW, hydropower contributing approximately 46% of it. This was achieved by involving private investors in the energy sector; Independent Power Producers (IPPs). Equally contributed to achievement in energy sector is a conducive legal and regulatory environment for private investors in this area. Currently, elaboration and development of 20 potential Green Mini Grid feasibility studies and Roll out plan is being carried out and will be handed over to private sector to increase the private sector contribution in energy generation. GoR will lease out these sites to private investor to better operate, Maintain and connect them to the off-grid beneficiaries. Consultancy service to update the National Electrification Plan (NEP) which will identify demarcation of the Off-grid areas around the country in relation to the Grid extension plan is under development. This exercise of identifying off-grid areas will also investigate and classify capacities of the embedded Pico hydro potential to contribute to the energy access in rural areas of the country.
Currently, 2 mini-grid hydropower plants are operational in Gicumbi and Muhanga Districts.
![]() | ECOS located in , Muhanga District with a capacity to generate 11KW |
Rushaki Power plant located in Gicumbi District with a capacity to generate 40KW |
Related Projects
110 kV Ntendezi–Bugarama
This project included the construction of a 17.5 km transmission line linking Ntendezi and Bugarama with the associated substations. This line transmission line will ensure power stability in the West of Rwanda and CIMERWA factory
View projectEASSDP- Electricity Access Scale up and sector wide Approach development project. CR N° 4651-RW
EASSDP- Electricity Access Scale up and sector wide Approach development project. CR N° 4651-RW information published by Rwanda Energy Group.
View projectRusumo Falls Hydro Power Project
The project is being developed under NELSAP umbrella for Rwanda, Burundi and Tanzania funded by the World Bank. Rusumo falls Hydropower Project is planned to generate 80 MW and the power output will be shared equally by three countries. The project consists of concrete dam with crest length of 150m,Headrace Tunnel of 460m and a surface power station with…
View projectElectricity Access ScaIe-Up Project Loan Agreement N°1293P”
Electricity Access ScaIe-Up Project Loan Agreement N°1293P” information published by Rwanda Energy Group.
View project110kV Jabana-Mt. Kigali-Gahanga and associated substations
The project consists of building a 27km long 110KV transmission line linking Jabana, Mont Kigali up to Gahanga Substation.
View projectRuzizi III
Rusizi III Hydropower (145MW) construction project is supported by the World Bank, EU, AfDB among others with an expected investment capital of $450 million and is expected to be completed by 2024. The project is being developed under CEPGL umbrella for Rwanda, Burundi and DRC. Rusizi III hydropower project planned to generate 147MW and the power output w…
View project