What We Do

Transmission

As of end of June 2023, the total length of the transmission network, including 220kV and 110kV lines, was recorded at 1158 km across the country.

At a Glance

1,158 km

Transmission network length

June 2023

1,158 km

Transmission network length

June 2026

Overview

Official REG energy infrastructure

As of end of June 2023, the total length of the transmission network, including 220kV and 110kV lines, was recorded at 1158 km across the country. 

The 70kV lines previously running through Birembo-Musha to Kabarondo substation that existed till 2013, were upgraded to 110 kV to improve network reliability and power supply stability amidst the country’s changing power demand profile. 

Official REG energy infrastructure

Related Projects

Transmission

220 kV Rusumo- Bugesera-Shango

The project consists of construction of a 119km long 220KV transmission line with its associate substations which will evacuate power from Rusumo Hydropower Plant (under construction) to Bugesera up to Shango

View project

Transmission

110 kV Jabana-Mt Kigali-Gahanga

The project constists of construction of a 27 km long 110KV transmission line linking Jabana, Mont Kigali and Gahanga to ensure sustainability of power supply in the City of Kigali.

View project