Solar

With a potential of 4.5 kWh per m2 per day and approximately 5 peak sun hours, solar energy has a huge potentiality in Rwanda. Currently, Rwanda’s total on-grid installed solar energy is 12.050 MW originating from 3 solar power plants namely Jali power plant generating 0.25MW, Rwamagana Gigawatt generating 8.5 MW, and the Nasho Solar plant generating 3.3 MW.

At a Glance

4.5 kWh/m²/day

Average solar resource

Reporting period not stated

Overview

Solar

With a potential of 4.5 kWh per m2 per day and approximately 5 peak sun hours, solar energy has a huge potentiality in Rwanda. Currently, Rwanda’s total on-grid installed solar energy is 12.050 MW originating from 3 solar power plants namely Jali power plant generating 0.25MW, Rwamagana Gigawatt generating 8.5 MW, and the Nasho Solar plant generating 3.3 MW. 

The Government of Rwanda intends to increase the number of solar power plants to reduce the cost of production and take advantage of available renewable sources in Rwanda.
 

Project List

Related Projects

Peat

Hakan Quantum Power Project

YUMN Ltd. is developing an 80 MW peat fired power plant in South Akanyaru prospect in Gisagara District and the project is to be developed as Public Private Partnership (PPP). On Feb 10, 2016, Amendment and Restatement Deeds for Power Purchase Agreement, Concession Agreement and Government Guarantee have been signed. Since February 2017 the project is und…

View project

Medium Voltage

Kigali Ring II

Installation of reactive power compensators (capacitor banks) at MV side of the following substations,: Gikondo, Jabana and Birembo. Each substation with 4.5MVAr;

View project

Peat

Gishoma 15 MW Peat to Power Project

Since 2010, the Government started development of the 15MW peat power plant in Gishoma, Rusizi District, to reduce electricity deficit which the country was facing and to coincide with a significant growth of electricity demand observed in the region as a result of the expansion of the local cement factory and country development.

View project

Transmission , Medium Voltage

Kigali Ring I

The project consists of construction of 27km of 110kV transmission line from Jabana to Gahanga via Mont Kigali, construction of 110/30/15kV, 40MVA substation at Mont Kigali, 110/15kV; 20MVA substation at Gahanga; addition of a second transformer at Birembo (20MVA)