Download Documents

  ELECTRICITY GENERATION July 2016-December 2016

 STATUS OF THE HYDROPOWER SECTOR IN RWANDA BY December 2016

  ENVIRONMENTAL, HEALTH AND SAFETY PLAN – EARP – SEAP

HIV/AIDS PREVENTION BEHAVIORAL  STRATEGY(HPBS) "AN AWARENESS TO REDUCE HIV/AIDS TRANSMISSION AT CONSTRUCTION SITES & NEARBY COMMUNITIES"

HIV/AIDs PREVENTION BEHAVIORAL STRATEGY(HPBS) - "AN AWARENESS TO REDUCE HIV/AIDS TRANSMISSION AT CONSTRUCTION SITES & NEARBY COMMUNITIES”

  ENVIRONMENTAL, HEALTH AND SAFETY PLAN

UPDATED ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP) FOR THE CONSTRUCTION OF NEW RULINDO SUB-STATION

  STRATEGIC ENVIRONMENTAL ASSESSMENT FOR EARP

RESETTLEMENT POLICY FRAMEWORK – EARP – EASP

RESETTLEMENT POLICY FRAMEWORK – EUCL – RESSP

RESETTLEMENT POLICY FRAMEWORK – RESSP

ABBREVIATED RESETTLEMENT ACTION PLAN FOR CONSTRUCTION OF MV LINES IN RULINDO AND RUHANGO DISTRICTS

PROJECT BRIEF ELECTRIFICATION OF CYANIKA-MIKO IN NYAMAGABE DISTRICT

PROJECT BRIEF FOR THE REHABILITATION AND UPGRADING OF THE EXISTING 30/110 KV SUBSTATION AT GIFURWE

PROJECT BRIEF FOR THE INSTALLATION OF LOW VOLTAGE AND MEDIUM VOLTAGE LINES AND SERVICE CONNECTIONS IN JANJA-MUZO AREAS IN GAKENKE

PROJECT BRIEF FOR THE CONSTRUCTION OF TRANSMISSION AND DISTRIBUTION LINES FOR GICUMBI AND GIKOMERO

PROJECT BRIEF FOR THE INSTALLATION OF LOW VOLTAGE AND MEDIUM VOLTAGE LINES AND SERVICE CONNECTIONS IN BUNGWE – KIVUYE - GATEBE AREA IN BURERA DISTRICT

SUBPROJECT BRIEF FOR THE REHABILITATION OF A 30/110kV SUBSTATION AT RULINDO AND 60KM 30kV DISTRIBUTION LINE FROM RULINDO TO BYUMBA AND GATUNA

PROJECT BRIEF FOR RUKARARA – KILINDA 110 KV TRANSMISSION LINE AND CONSTRUCTION OF SUBSTATIONS

PROJECT BRIEF AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR RURAL ELECTRIFICATION OF WESTERN ZONE: RUSIZI, NYAMASHEKE, RUTSIRO AND KARONGI DISTRICTS

PROJECT BRIEF AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR RURAL ELECTRIFICATION OF EASTERN ZONE:NYAGATARE, GATSIBO, KAYONZA, RWAMAGANA, KIREHE AND NGOMA DISTRICTS

PROJECT BRIEF AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR RURAL ELECTRIFICATION OF EASTERN ZONE: NYAGATARE, GATSIBO, KAYONZA AND NGOMA DISTRICTS

SUBPROJECT BRIEF FOR THE REHABILITATION OF A 30/110kV SUBSTATION AT RULINDO AND 60KM 30Kv DISTRIBUTION LINE FROM RULINDO TO BYUMBA AND GATUNA

 ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP)FOR ELECTRIFICATION OF NORTHERN ZONE OF RWANDA(Gicumbi, Rulindo, Nyabihu&Ngororero Districts)

BEST PRACTICES AND SCREENING TOOLS IN MAINSTREAMING ENVIRONMENTAL AND SOCIAL SAFEGUARDS INTO EARP

ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP): REHABILITATION OF SUBSTATIONS 110/30KV: RULINDO, GIFURWE CONSTRUCTION OF SUBSTATION: RUKARARA

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT STUDY OF CONSTRUCTION OF ELECTRICAL TRANSMISSION AND DISTRIBUTION NETWORK IN SELECTED DISTRICTS OF SOUTHERN PROVINCE OF RWANDA

ENVIRONMENTAL AND SOCIAL REQUIREMENTS FOR TENDERINGS

ENVIRONMENTAL AND SOCIAL REQUIREMENTS FOR TENDERINGS

 ENVIRONMENTAL MANAGEMENT PLAN CYANIKA –MIKO

ENVIRONMENTAL MANAGEMENT PLAN FOR THE CONSTRUCTION OF 110Kv TRANSMISSION LINES FROM RUKARARA TO KILINDA

  ENVIRONMENTAL MANAGEMENT PLAN FOR THE CONSTRUCTION OF TRANSMISSION AND DISTRIBUTION LINES FOR GICUMBI AND GIKOMERO

  PROJECT BRIEF FOR THE CONSTRUCTION OF A 30/110kV SUBSTATION AT RULINDO

PROJECT BRIEF FOR THE REHABILITATION OF A 30/110kV SUBSTATION AT RULINDO AND 60KM 30kV DISTRIBUTION LINE FROM RULINDO TO BYUMBA AND GATUNA

  SCOPING REPORT FOR RUKARARA – KILINDA 110 KV TRANSMISSION LINES

  ENVIRONMENTAL MANAGEMENT PLAN FOR THE INSTALLATION OF LOW VOLTAGE AND MEDIUM VOLTAGE LINES AND SERVICE CONNECTIONS IN JANJA AREA IN GAKENKE

  ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT STUDY FOR THE CONSTRUCTION OF TWO RING MAIN UNITS, A SUBSTATION AND IMPROVEMENT OF TRANSMISSION AND DISTRIBUTION NETWORK IN KIGALI- RWANDA

   ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK – EASP

  ABBREVIATED RESETTLEMENT ACTION PLAN FOR CONSTRUCTION OF MV LINES IN RULINDO AND RUHANGO DISTRICTS

    SUBPROJECT BRIEF FOR THE REHABILITATION OF A 30/110kV SUBSTATION AT RULINDO AND 60KM 30kV DISTRIBUTION LINE FROM RULINDO TO BYUMBA AND GATUNA

   ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP) FOR EXPANSION OF ELECTRICITY DISTRIBUTION NETWORK OF KIGALI CITY SUB-PROJECT

  ABBREVIATED RESETTLEMENT ACTION PLAN FOR THE CONSTRUCTION OF ELECTRICAL (MV)LINES IN RUHANGO DISTRICT

  UPDATED ABBREVIATED RESETLEMENT ACTION PAN (ARAP) FOR THE CONSTRUCTION OF MEDIUM VOLTAGE (MV) LINES IN GIGUMBI AND GASABO (Gikomero) DISTRICTS.

  ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP) FOR THE CONSTRUCTION OF RUKARARA SUB-STATION AND 110KV FEEDER LINE

   ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP) FOR THE CONSTRUCTION OF RUKARARA SUB-STATION, 110KV FEEDER LINE AND RUKARARA-KIRINDA HV LINE   

 ABBREVIATED RESETTLEMENT ACTION PLAN FOR THE CONSTRUCTION OF ELECTRICAL LINES IN GAKENKE DISTRICT(ARAP)

   ABBREVIATED RESETTLEMENT ACTION PLAN FOR THE CONSTRUCTION OF 55, 7 KM OF MEDIUM VOLTAGE AND 107 KM OF LOW VOLTAGE IN NGORORERO DISTRICT (NDARO, BUNGWE, BWIRA AND GATUMBA SECTOR)

 


 Environmental Management Plan For The Construction Of 110kv Transmission Lines From Rukarara To Kilinda


Resettlement Action Plan For Construction Of Mv Lines In Rulindo And Ruhango Districts


Environmental Management Plan For The Construction Of Transmission And Distribution Lines For Gicumbi And Gikomero 


Environmental Management Plan Checklist And Format For Low-Risk Topologies


Energy Small and Medium Enterprises Grant Project


 Process Towards Independent Power Producers In Rwanda


Energy – The Opportunity in Rwanda


Energy Teaser


 Rwanda Energy Sector Forum


Geothermal Breakout Session


 Electricity Regulatory Framework 


Hydropower Solar Breakout session 


Methane Peat Waste Breakout session


National Energy Policy and Strategy 


Rwanda Power MArket Role of EWSA


Overview of energy sector projects


IKWIRAKWIZWA RY'INGUFU ZA BIYOGAZI MU RWANDA RIKORWA NA EWSA


Environmental Management Plan for the Installation of Low Voltage and Medium Voltage Lines and Service Connections in Janja area in Gakenke


 REG_Procurement Procedures Manual


 

 

 

Hits: 4960
Copyright © 2017 Rwanda Energy Group Limited . All Rights Reserved.